CS-02Trades
Seven trades, one method.
Each trade is counted the way that trade prices it, twice, with the spec section and the sheet behind every line. Pick yours for what's in the takeoff, what estimators miss and what you get back.
- 09 51 13 · 09 51 23 · 09 53 00Acoustical ceilingsAcoustical ceiling takeoff: ACT square feet by tile and grid type, room by room from the RCP, every ceiling height sourced or flagged. Back in 48 hours.SF by type and height, perimeter LF, heights listed
- 10 11 00 · 10 21 13 · 10 28 00 · 10 44 00 · 10 51 00Division 10 specialtiesDivision 10 takeoff services for toilet accessories, partitions, lockers, boards and extinguisher cabinets, counted by tag and room, twice, in 48 hours.Each, by tag and room; lockers in openings and frames
- 08 11 13 · 08 14 16 · 08 71 00Doors and framesDoor and frame takeoffs from your bid set: the door schedule checked against every plan tag, the hardware set on each opening, mismatches listed, in 48 hours.Each, by type and rating
- 09 65 13 · 09 65 19 · 09 68 13Flooring and baseFlooring takeoff services: LVT, VCT and carpet tile SF by finish, room by room to the door centerline, with base LF net of doors. Counted twice, in 48 hours.SF by finish, base LF
- 08 33 23 · 08 33 26 · 08 36 13Overhead doorsOverhead door takeoffs from your bid set: every coiling and sectional door by opening size, operator, rating and wind load, with power and controls noted.Each, by opening
- 12 24 13 · 12 21 13 · 12 21 16Window coveringsCommercial window covering takeoffs from your bid set: every shade by opening size, mount, bands, motors and channels, counted twice, back in 48 hours.Each, by size and type
- 08 87 00Window filmWindow film takeoffs from your bid set: each lite's daylight opening in SF by film and side, attachment LF, splices and glass flags, back in 48 hours.SF by film type
What we don't take off: pipe, conduit, wire and duct runs, sprinkler heads, concrete, steel, roofing, sitework and floor-prep quantities. We'd rather say no than send you a guess.